Home > Products > Hydraulic Lifting Platform

Heavy Duty Hydraulic Lifting Platform For PEB Roofing Work

  • Heavy Duty Hydraulic Lifting Platform For PEB Roofing Work
  • Heavy Duty Hydraulic Lifting Platform For PEB Roofing Work
  • Heavy Duty Hydraulic Lifting Platform For PEB Roofing Work
  • Heavy Duty Hydraulic Lifting Platform For PEB Roofing Work
  • Heavy Duty Hydraulic Lifting Platform For PEB Roofing Work

Machine Appearance

IMG_4289.jpg

IMG_4313.jpg


Main Components

Technical Specification


Structure

Lifting Platform includes 3 parts:  Mechanics, Hydraulic,Electrical.

Function

The mechanics part is composed of the upper part and thelower part.

The upper part changes the angle through the big arm, the forearm and the rotating support to make the roll forming machine reach the appropriate roofing output position.

The lower part is mainly to stabilize support and fix the upper part.

The hydraulic part is composed of the upper part and the lower part.

The lower part is controlled by the getting-off multi-way valve to extend or retract the four outriggers, and the multi-way valve is implemented manually.

The upper part is controlled by solenoid valves to control the main boom, the forearm, telescopic, hoisting, rotation, and roofing machine cutting.

The electrical part mainly controls the circuit of equipment, the actions of various parts of the lifter and roll forming machine.

Electrical control has two functions: manual control and remote control.


Production Parameters

No.
Technology parameter
1
Maximum lifting height
16.5m
2
lifting weight
7Tons
3
Max lifting weight
9 Tons
4
suit for roof sheet height
4-17m
5
Suitable material
PPGI PPGL
6
Suitable thickness
0.3-1mm
7
working speed
5m-35m/min
8
roof sheet length
1m-160m
9
coil rangew
1m-12m
10
return radius
5000mm
11
length
9.5m
width
2.2m
height
3.5m


Contact Us
Follow Us